How a project runs

Design, quote, permits, build, walkthrough.

Five stages, in this order, every time. Here is what happens in each one, who you deal with, and what you sign.

Hands marking up a set of renovation drawings with a pencil and a folding rule on a wooden table

STAGE 1 · 3 TO 6 WEEKSDesign

Our designer visits, measures and photographs the room, then asks the questions that change a drawing: who cooks, where the coats go, what bothers you about the room now. You get a plan, elevations and a selection list for every finish. Two rounds of revisions are included.

Design is a paid stage: $1,500 for a bathroom, $2,500 for a kitchen or basement. It is credited in full to the build if you go ahead with us.

Once design is paid, the drawings are yours, whether we build them or not.

STAGE 2 · ABOUT 1 WEEKQuote

The quote is built from the final drawing, one line per item: demolition, each trade, each material, permit fees, disposal. Where something can't be known until a wall is open, like a soft subfloor under an old tub, we say so and give its price in advance. A surprise has a price before it happens.

With the quote comes a written contract, the schedule, and a payment plan tied to stages of work, not to calendar dates.

STAGE 3 · 2 TO 4 WEEKSPermits

We pull the building permit where the work needs one: moving plumbing, removing a load-bearing wall, adding a bedroom or a window. Waterloo, Kitchener and Cambridge each run their own permit desk, and we plan your start date around their review time. If a structural engineer is needed, we hire them and their fee is in the quote.

While the permit is under review, we order materials. Nothing comes down until both are ready.

STAGE 4 · 3 TO 12 WEEKS ON SITEBuild

One lead carpenter runs your job from the first day to the last, with our regular electrician, plumber, tiler and drywall crew working to the schedule. Dust walls go up on day one. The site is swept every afternoon. Every Friday you get an update like this one:

Friday update · Week 2 of 5From your lead carpenter

Hello, here's where the bathroom stands.

  • Done this week: plumbing rough-in, new fan duct to the outside wall, blocking for the grab bar.
  • Inspection: booked for Tuesday morning. Nobody needs to be home.
  • Next week: membrane and flood test Wednesday, tile starts Thursday.
  • Decision needed: grout colour by Monday. Two samples are on the vanity top.

Schedule: on track for the walkthrough on the last Friday.

STAGE 5 · THE LAST DAYWalkthrough

On the last day we walk the room with you and write down anything that isn't right, from a sticky drawer to a paint touch-up. That list gets fixed before the final invoice. Our workmanship warranty is two years, written into the contract.

EXAMPLEWhat a signed schedule looks like

Here is the schedule for a typical main bathroom. Yours has calendar dates in place of week numbers.

Schedule example: a main bathroom
WhenOn siteWho's thereHold point
BeforeDesign, quote, permit, orderingDesigner, officePermit issued, all materials in our shop
Week 1Protection, demolition, plumbing rough-inLead carpenter, plumberPlumbing inspection
Week 2Membrane on walls and floorLead carpenter24-hour flood test
Week 3Floor and wall tile, grout, sealTilerNone
Week 4Vanity, toilet, taps, lights, paint; glass measuredLead carpenter, plumber, electricianGlass made, about 10 working days
Week 5Glass installed, final clean, walkthroughLead carpenter, glazierFinal inspection

Ready for stage one?

It starts with a call and a free site visit. Send the estimate form or phone us.