Monday
In the shop
Doors arrive, get labelled and degreased.
In your kitchen
Open boxes, cleaned and degreased. Shelves stay in.
Usable from 5 p.m.
How it works
Most of the careful work happens in our shop, away from your kitchen. Here is the order we follow on every job.
We count every door and drawer front, test the current finish and leave sample boards in your colour.
Each piece is numbered to its spot, hinges and screws bagged, and the lot wrapped for the shop.
Degreased, scuffed and sanded. Old hardware holes filled if you are changing pulls. Then a bonding primer.
Kitchen masked, frames and panels cleaned, sanded, primed and finished by brush and fine roller. We never spray in your home.
Sprayed flat in a dust-controlled booth, both sides, with a light sand between coats.
Doors back on, hinges adjusted so the gaps line up, new hardware fitted, and a walk-through with you.
We work from about 8:30 to 4:30 and lift the masking before we leave, so the counters and sink are yours in the evening.
Doors arrive, get labelled and degreased.
Open boxes, cleaned and degreased. Shelves stay in.
Usable from 5 p.m.
Sanding, filling and primer.
Masking, sanding and primer on the frames.
Usable from 5 p.m.
First finish coat on both sides.
First coat on the frames and panels.
Usable from 5 p.m.
Second coat, then the doors rest overnight.
Second coat and touch-ups.
Light use only, keep off the frames
Doors checked under bright light and wrapped.
Rehang, adjust, hardware, clean-up.
Fully yours again
The finish feels dry on Friday, but it keeps hardening for about a month. Treat it gently in that time and it will stay hard for years.
We usually book three to five weeks out. Call or send the form and we will set up a colour visit.